Tacoma Gateway II is a speculative distribution center in Parkland, Washington. Located on a 16.6 acre site on Spanaway Loop Road, Tacoma Gateway II is 273,816...
Construction crews recently tilted wall panels for Gayteway Business Park’s Building G in Arlington, WA. The third building to be constructed in the new indust...
Currently under construction, Bridge Point Kent 300 is a speculative industrial development made up of two buildings. Building A will be approximately 50,000 sq...
Currently under construction, Track 6 will be a new 4-story, Class-A industrial building located on the old Compton Lumber site in the middle of Seattle’s SODO...
Terrace Station, a 14-acre three-phased mixed use development in Mountlake Terrace, has changed the view along I-5 in Mountlake Terrace. Constructed alongside...
Sierra Construction recently completed River's Edge, a new 166-unit apartment community in Monroe, Washington. Floorplans include 1,2, and 3-bedroom units, desi...
Bridge Point Auburn 200 is a 203,127 square foot speculative concrete tilt-up distribution center. The 11.47 acre site was previously owned by Supervalu and ha...
Sierra Construction and Ness Campbell have completed the tilt for Tacoma Gateway II in Parkland, Washington. The 100-panel tilt (91 wall panels and 9 ramp pane...
Prologis PDX 23 has received LEED Gold Certification. Completed this summer, PDX 23 is a 154,243 square foot distribution center located in the Columbia Corrid...
Currently under construction, Eclipse Fremont is a five-story wood-framed apartment building with 153 residential units. Located at 909 N. 39th St. on the corn...