Project Swift included a build-out for medical supplier, McKesson Corporation, in the recently completed Bridge Point Kent 300.
The scope of work included a 13,030 square feet office build-out, as well as 236,859 square feet of warehouse shell improvements. Those included dock equipment upgrades (26 dock leveler packages, 30 dock seals, and 2 automatic operators), 3,693 square feet flammable liquid storage, as well as the expansion of MEP systems including 1 2,960-gal diesel generator, 14 RTU's, 2 ERV's, 1 DOAS and 12 gas unit heaters. Coordination with owner-vendors for installation of three-level pick modules totaling 84,000 square feet, 31'-0" high racking covering 90,000 square feet of footprint, automated conveyor systems and freezer/coolers.
Exterior improvements including four motorized swing gates, two turnstiles, 2,000 linear feet of ornamental fence, 750 linear feet of chain link fence, a 51'-0" drive-in ramp, picnic canopies and a flagpole.
Sierra Construction Team:
Kirk MacGowan, Senior Project Manager
Diane Yoo, Project Engineer
John Sharpe, Superintendent
Jessica Dowrey, Project Administrator
Project Team:
Clients: Mckesson Corporation
Architect: KSS Architects
Engineers: AHBL, Terra Associates, Lang Joist Inc
General Contractor: Sierra Construction
Subcontractors include: Olympic Concrete Cutting, Tube Art Displays, Marvin Sheet Metal, Buckley Welding Services, Infiniti Window Coverings, SS Landscaping Services, PAPE Engineered Products, Cascade Door & Hardware, Auburn Mechanical, Worldwide Material Handling, CanAm Coatings, Kell Chuck Glass, Atlantis Rail Systems, Tri Star Roofing, Stark Tech Operating Company, Interior Wood Products, Masonry Maintenance Specialties, State Mechanical, Acoustics NW, Fawcett Painting, McKee Enterprises, Panelized
Photos: Seven Maples Photography